Lucent Technologies -48V CPS4000/CPS4000 PLUS Cabinet Power System
5 - 40 Installation and Testing Issue 13 December 2000
Installing Output Distribution Circuit Breakers
In Working Plants To install circuit breakers for loads being added to a working plant,
follow this procedure:
Installing Output Distribution Circuit Breakers
in Working Plants
Step Action
1
Verify that each circuit breaker is Off prior to installation.
2
Install the breakers.
3
Operate all circuit breaker switches to On position.