UNLOADING
&
ASSEMBLY
INSTALL
DRAPERS
NOTE:
For
Double Delivery Headers, right and left side drapers are different lengths. Be sure you
have the drapers properly positioned. Drapers are marked with
an
identification number. Always install
the [ower number on the left side.
ego
25 ' Double Delivery Header: Left side draper #49503 Right side draper #49504
To install:
1. Use this chart to position connector tubes
at
the appropriate rows
of
hotes for desired opening size.
NOTE: The second row
of
holes at each set is provided to allow minor adjustments.
(!ii
;TION
••
<1
~.
CENTER-DEliVERY
,CPENINGWlDTH
DESIGNATED
'APPLICATION'--
«P
"(between,rollers) and
C:OMMENTS
Row
A
10
Row
F
(both
drapers)
32.5"
(825
mm)
Opening
for
combine
models:
Case
2166,
1660,1460
New
Holland
TR9?, TR87,
TR96",
TR8S·
("
1991
and
after)
Row
B
to
Row
F
(both
drapers)
34.5"
(875
mm)
Opening
for
combine
models:
Case
2188,1680,1480;
MF8570;
NH
TROO",
TR86"
(·1990
and
prior),
all
Gleaner,
all
White
Row
B to
Row
E
(UH
draper)
42"
(1067
mm)
Maximum
opening
for
shifting
deCks
on
21'
Header.
Row
C to
Row
E
(RIH
draper)
Row
C
to
Row
F
(both
drapers)
52S
(1335
mm)
Opening
for
combine
models:
all
JD,
all
NH-lX,
all
Claas,
MF
860,
8460,
8450
Row
C
to
Row
E
(both
drapers)
54S
(1384
mm)
MaxImum
opening
for
shifting
decks
on
30'
Triple
Delivery
Hdr.
Row
C
to
Row
E
(UH
draper)
61"
(1549
mm)
Maximum
opening
for
shifting
decks
on
25'
Double
&
Triple
Row
D
to
Row
E
(RIH
draper)
Delivery,
30'
Double
Delivery
and
36'
Headers.
Row
D
to
Row
F
(both
drapers)
66"
(676
mm)
Maximum
opening
on
all
header
sizes
for
center
delivery
only.
\\
II
2.
Cut excessive flap
off
of
draper, leaving 3/4"
(20 mm) extending above the connector.
Trim
the new ends
at
the front corners as shown.
This allows draper to fit properly under front
draper seal (D) to prevent tearing
of
front
edge. Use the cut-offs as a guide for
trimming.
TRIM FRONT EDGE OF
NEW
CONNECTION
70