Manitowoc Published 11-20-19, Control # 234-19 3-9
MLC300 OPERATOR MANUAL OPERATING CONTROLS AND PROCEDURES
Pins, Live Mast Hinge Winch, Rigging
Pins, VPC Trolley Front Winch, Rigging (Pay Out/Haul In)
Pins, VPC Trolley Rear
Trolley, Rotating Bed Mounted (In/
Out)
Signal, Transmission Trolley, Beam Mounted (In/Out)
Speed, Fast
Speed, Slow
Tensioner, Crawler Track Left (past
production)
Tensioner, Crawler Track Right
(past production)
Table 3-3. Symbol Identification — Remote Control