www.masimo.com 17 Masimo
Chapter 3: Setting Up the System
Unpacking and Inspecting the System
To unpack and inspect the system
1. Remove the components from the shipping carton and examine them for signs of
shipping damage.
2. Check all materials against the packing list. Save all packing materials, invoice
and bill of lading. These may be required to process a claim with the carrier.
3. If anything is missing or damaged, contact Masimo Technical Service.
Preparation for Use
Prior to using SedLine for monitoring
1. Confirm that you have all system components:
• Root
• SedLine Module
• SedLine Patient Cable
• SedLine Sensor
2. Confirm that Root holds adequate battery power.
3. Confirm that you have alcohol swabs for sensor application.