EasyManua.ls Logo

McHale HS2000 - Maintenance Intervals

McHale HS2000
91 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
McHale HS2000 Round Bale Wrapper
71
12.1 Maintenance intervals
The following intervals should be adhered to, in order to ensure a long and efficient life
for the machine and maximum safety of personnel. They assume constant working
during the wrapping season.
First 5 working hours
1. Check all nuts and bolts for tightness. Tighten if necessary.
Every day
1. Grease bale lift arm hinges
2. Grease table pivots
3. Grease bale tip hydraulic cylinder ends
4. Grease cut and hold plunger
5. Check wheel-nuts
6. Check all guards and safety related components
7. Check for any oil leaks and damaged pipes
8. Check dispenser trip arm function, see “Testing trip arm operation” on page 65
and “Dispenser trip arms” on page 75.
Every Day

Table of Contents

Related product manuals