EasyManua.ls Logo

Mercury 90-863160

Mercury 90-863160
597 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OILDYNE TRIM PUMP
SERVICE MANUAL NUMBER 28
90-863160 MAY 2000 Page 5A-13
2. Connect the gauge at the most convenient location.
70598
a
d
b
c
e
Gauge Connected to Pump
a-Hydraulic Test Gauge
b-Hose Connected to UP (Left Hole)
c-Fittings - (Supplied with Gauge)
d-BLACK Hose (From Gimbal Housing)
e-GREY Hose (From Gimbal Housing)
50390
A
B
b
c
a
Gauge Connected to Hydraulic Connector
a-Test Gauge
b-Coupling (Supplied with Gauge)
c-Front Hydraulic Connector Port
3. Open valves “A” and “B” and the run pump OUT/UP and IN/DOWN several times to
purge air.
4. Run the pump OUT/UP until the trim cylinders are fully extended.
5. Observe the gauge while pumping. The pressure should be 2200-2600 psi
(15173-17932 kPa).

Table of Contents

Related product manuals