Operation
66
Programme sequence indicator
After the programme has started, the programme sequence can be
followed on the three-line display.
Top line
– Programme name.
Middle line
The following parameters can be checked using the and arrow
buttons:
– Current programme block, e.g. Main wash 1,
– Actual or required temperature
(depending on the display set, see "Further settings/Display:
Temperature"),
– A
0
value,
– Conductivity
(only with conductivity meter).
– Cycle number,
Bottom line
– Time left (in hours; under an hour, in minutes).
At the end of the programme
A programme is usually finished when the following parameters and
messages are shown in the display:
Top line
– Programme name.
Middle line
Continuously alternating between:
– Parameter met/not met,
– A
0
value,
– Conductivity in final wash block
(only with conductivity meter).
– Cycle number,
Bottom line
– Programme finished.
In addition, the LED in the Start/Stop button goes out and the LED in
the button begins to flash. In the factory default state, an acoustic
tone also sounds for approx. 10 seconds (see "Settings/Volume").