EasyManua.ls Logo

Millipore Synergy - Replacing the SynergyPak

Millipore Synergy
49 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION
Chapter 4 INSTALLATION
4-1 PREPARATION OF THE SYSTEM
Open the front cover. Locate the tie wrap used to hold the Booster Pump in place during shipping
(A).
Press on the tab of the tie wrap (B). Remove and pull the tie wrap out.
Locate the protective foam found at the UV lamp cable. Remove it (C).
A
B
C
- 8 -

Table of Contents

Related product manuals