EasyManua.ls Logo

Millipore Synergy - Installation

Millipore Synergy
49 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MAINTENANCE
INSTALLATION
D
E
F
Remove the new SynergyPak from its shipping
box.
Remove the protective caps on the ports of the
SynergyPak.
Locate the O-rings on the ports. Wet them with
water. It is preferable to wet them with
ultrapure water.
Install the SynergyPak until it is fully seated into
the system ports as shown (D, E and F).
CLOSE THE FRONT COVER.
- 31 -

Table of Contents

Related product manuals