EasyManua.ls Logo

Milltronics HydroRanger Plus - Page 85

Milltronics HydroRanger Plus
169 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
P145 PEAK B SETPOINT
Enter the value (similar to Relay B Setpoint, P113) to be used for the
high energy cost period.
This feature allows the pump(s) to be stopped before the normal Relay B
Setpoint, to reduce pump running time during the high energy cost period.
values: 0.000 to 9999 (preset = 0.000)
The following example illustrates high energy cost usage reduction and/or elimination
by utilizing the HYDRO+ Pump Energy Cost Reduction features.
P146 TIME OF DAY SETPOINT
Use this feature to set the time at which a relay set for time day alarm
(P111 = 9) will alarm.
Enter the time in HH.MM (24 hr) format
ENERGY SAVING EXAMPLE
( Wet Well, " Pump Down " Application )
Peak Lead time (P143)
Regardless of the Relay A Setpoint, pump
starts are initiated, and level falls to the
Relay B Setpoint.
Peak Start Time (P141)
Low level for start of high energy cost period. Now
Relay A / B Setpoints are disregarded. Pumping is
initiated only if the Peak A / B Setpoints (P144 /
P145) are reached. *
Peak End Time (P142)
With the high energy cost period now over, Peak
A / B Setpoints are disregarded. Pumping is
initiated as the normal A / B Setpoints are reached.
* When the Peak A Setpoint is not reached, no energy is used during the " high
cost " period. If the Peak A Setpoint is reached, the Wet Well is only pumped
down to 60 %, thereby minimizing " high cost " energy usage.
Normal Operation
During low energy cost period Relay A / B
Setpoints (P112 / 113) are used to initiate pump
starts and pump stops.
PARAMETERS
PL-507 85

Table of Contents

Related product manuals