This document and the information contained herein, is the exclusive property of MODE. And represents a nonpublic,
confidential and proprietary trade secret that may not be reproduced, disclosed to third parties, or otherwise employed in
any manner. whatsoever without the express written consent of MODE. Copyright © (2016) MODE. Allrights reserved.
Local requirements may demand other commissioning testing to be
performed before the product can be used. Make sure all the local
requirements are fulfilled.
All optional features shall be tested before using the product.
6.5 After test runs
Visual check
Check visually that the hoist or any other part has not been
damaged in any way during commission testing.
Cleaning
Check that all tools and materials used during installation are
removed from the hoist and track.
User training
Ensure that the hoist operator and supervision personnel are aware
of the need for user training. The authorized service organization of
the hoist manufacturer can arrange user training by separate
agreement.
Handover documents
Check the documents delivered with the hoist. Ensure that entries
in the documents are properly recorded and that the reference data
in the documentation matches that on the type rating plates.
Compile a commissioning log for the hoist and store it together with
the other documentation for the hoist.