6 COMMISSIONING
Note: Before handing over the equipment, proper commissioning shall be
done. Inspections and adjustments are listed in “Installation and
commissioning instructions”.
The equipment shall not be used before proper commissioning.
The commissioning procedure requires special skills and tools to
ensure safe and reliable operation of the equipment. Commissioning
shall be carried out only by authorized service personnel or an
experienced service technician authorized by the manufacturer or
manufacturer’s representative.
Before commissioning the instructions in chapter "Safety first" shall
be read.
Any defects or abnormalities which are detected during
commissioning must be investigated and corrected in accordance
with the instructions relevant to component in question.
Local requirements may demand other commissioning testing to be
performed before the equipment can be taken into use. Make sure all
of the local requirements are fulfilled.
6.1 Commissioning preparations
During installation, commission and maintenance, lockout-tagout
procedures must be followed in accordance with local regulations
and the documented site lockout-tagout policy. Refer to chapter
“Lockout -Tagout procedure”.
Ensure that there are no hazards from loose items
Items which are not properly secured to the product, such as tools
or detached components, could move or fall accidentally, with
potentially serious consequences.