38 of 82 MANUAL-75-v2.0
3.2 Positioning the unit
When you transport the unit to the desired location, make sure to position and set up
the unit correctly before operation.
To position the unit correctly, follow these steps:
1. Make sure the operating area is level, dry, clean, and free of debris.
2. Position the unit in a location that provides good access to necessary
connections.
3. Use wheel chocks to secure the unit trailer in place.
4. Deploy the tongue jack and unhitch the unit from the tow vehicle.
5. Level the unit by adjusting the tongue jack height.
Caution
Risk of damage!
Do not move the unit with the tongue jack deployed.
3.3 Turning on the unit
Before you start operating the unit, turn the unit on and set the desired output voltage
to match your requirements.
To turn on the unit, follow these steps:
1. At the back of the unit, locate the top right panel door.
2. If needed, unlock the panel door with the supplied keys, and then pull the latch to
open the door.
3. On the top right panel, switch the
Main Breaker
switch to the
OFF
position.
MP75-600 - User Manual 3 Quick start