3. Lower the base close to the wing but not quite resting on it, close
enough for the five retaining bolts to reach the wings through the
base.
4. Insert the four retaining bolts (two on each corner of the base) and
tighten. Note that some versions have locknuts.
5. Repeat steps 1 to 4 to mount the other wing.
6. Lower the base completely so it is resting on both wings.
7. Put the weights onto the wings. Bolt requires 800kg of weights on
both sides.
Anchoring Bolt X On Pedestal to the floor
If you are setting up Bolt X On Pedestal in a permanent (or
semi-permanent) location, it is recommended that you anchor the
pedestal to the floor. If this is not possible, as an alternative you can hold
Hint
You can move Bolt X using a pallet jack without removing the wings
if you want, as long as you take the weight plates off first.