OPERATING AND MAINTENANCE MANUAL
Chapter 5 - Installation
TAEevo Tech 015÷802 60 Hz UL
26
The data in this manual are not binding and they can be modified by the manufacturer without notice. Reproduction of this manual is strictly prohibited
ENGLISH
EN
Process water inlet Process water outlet
Pump type: Ebara 3D Pump type: Ebara 2CD
Pump type: Lowara NSC Pump type: Lowara CIE
When filling the circuit with liquid check to ensure the absence of air bubbles and contaminants. If the pump runs
noisily or emits anomalous noise it may be necessary to bleed the liquid circuit in order to prime the pump.
The procedure is as follows:
• unscrew the filler/breather plug at the top of the pump
• fill the hydraulic circuit until water starts to overflow from the filler hole
• refit the plug and tighten it
Repeat the operation if the pump continuous to run noisily, in such a way as to eliminate any air that had
previously remained trapped in the impeller vanes.