EasyManua.ls Logo

NEC NP-PH3501QL - 1 Before Setting up Your Projector; Clearance for Installing the Projector (English)

NEC NP-PH3501QL
162 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1
1. Before Setting Up Your Projector
1-1. Clearance for Installing the Projector (English)
Allow ample clearance between the projector and its surroundings as shown below.
The high temperature exhaust coming out of the device may be sucked into the device again.
Avoid installing the projector in a place where air movement from the HVAC is directed at the projector.
Heated air from the HVAC can be taken in by the projector's intake vent. If this happens, the temperature inside the
projector will rise too high causing the over-temperature protector to automatically turn off the projectors power.
Intake vent
Exhaust vent
Intake vent
Intake vent Exhaust vent
Exhaust vent
Installation conditions for the projector
Example 1 – If there are walls on both sides of the projector.
60 cm/23.6" or greater 60 cm/23.6" or greater
NOTE:
• Thedrawingshowstheproperclearancerequiredforthefront,back,andtopoftheprojector.
• Theabovedrawingcanalsobeappliedtotherequiredclearancebetweenintakeventandtheoorfortheportraitprojection.
• Seepage115foraninstallationexampleonportraitprojection.
Example 2 – If there is a wall behind the projector.
(1) For oor installation:
70 cm/27.6" or greater
Lens
NOTE:
• Thedrawingshowstheproperclearancerequiredfortheright,left,andtopoftheprojector.

Table of Contents

Other manuals for NEC NP-PH3501QL

Related product manuals