EasyManua.ls Logo

Nord Drivesystems NORDAC LINK SK250E-FDS - Motor Control Commissioning Steps; Temperature Sensors

Nord Drivesystems NORDAC LINK SK250E-FDS
212 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4 Commissioning
BU 0250 en-3021 67
Pos: 177 /Anleitungen/ Elektronik/F U und Starter/4. Inbetriebna hme/Inbetriebnah me Betriebsarten Motorregler (P300) [SK 1x0E, SK 2xxE, SK 5xxE]/Inbetriebn ahmeschritte Motorr egelung [SK 2xxE, SK 5 xxE, SK 2xxE-FDS, SK 500P] @ 30\mod_15525 58942460_388.doc x @ 2507657 @ 3 @ 1
4.3.3 Motor control commissioning steps
The main commissioning steps are mentioned below in their ideal order. Correct assignment of the
inverter / motor and the mains voltage is assumed. Detailed information, especially for optimisation of
the current, speed and position control of asynchronous motors is described in the guide "Control
optimisation" (AG 0100). Detailed commissioning and optimisation information for PMSM in CFC
closed loop mode can be found in the "Drive optimisation" guide (AG 0101). Please contact our
Technical Support.
1. Carry out the motor connection as usual (note ∆ / Y!). Connect the encoder, if present
2. Connect the mains supply
3. Carry out the factory setting (P523)
4. Select the basic motor from the motor list (P200) (ASM types are at the beginning of the list, PMSM
types are at the end, designated by their type (e.g. …80T…))
5. Check the motor data (P201 … P209) and compare with the type plate / motor data sheet
6. Measure the stator resistance (P220) P208, P241[-01] are measured, P241[-02] is calculated
(Note: is an SPMSM is used, P241[-02] must be overwritten with the value from P241[-01])
7. Encoders: Check the settings (P301, P735)
8. with PMSM only:
a. EMF voltage (P240) motor type plate / motor data sheet
b. Determine / set reluctance angle (P243) (not required with NORD motors)
c. Peak current (P244) motor data sheet
d. Only for PMSMs in VFC mode:
determine (P245), (P247)
e. Determine (P246)
9. Select the operating mode (P300)
10. Determine / adjust the current control (P312 P316)
11. Determine / adjust the speed control P310, P311)
12. PMSM only:
a. Select the control method (P330)
b. Make the settings for the starting behaviour (P331 … P333)
c. Make the settings for the 0 pulse of the encoder P334 … P335)
d. Activation of slip error monitoring (P327 ≠ 0)
Further information for commissioning NORD IE4 - motors with NORD frequency inverters can be
found in the technical information TI80_0010.
Pos: 178 /Anleitungen/ Elektronik/F U und Starter/4. Inbetriebna hme/SK 1xxE, SK 2xxE, - FDS/Temperatursensor en/Temperatursensor en [SK 2xxE-FDS] @ 38\mod_1568 716707782_388.doc x @ 2560332 @ 2 @ 1
4.4 Temperature sensors
Connection of motors with temperature sensors (KTY-84 or PT100/PT1000) requires technical
clarification with our Technical Support.
Pos: 179 /Allgemein/A llgemeingültige Module/---------Seitenumbruch kompakt --------- @ 13\mod_14763696959 06_0.docx @ 2265495 @ @ 1

Table of Contents

Related product manuals