96 The Information Company
In addition t
o manually initiated pause and resume, TX1 supports power loss situations
as well. For the supported job types (e01, ex01, dd, dmg), if power is unexpectedly
lost during an imaging job, it can be resumed after power is restored and the system is
booted up.
To resume a supported imaging job after a power loss event:
Note: As with manually paused jobs, the original source and destination drives are
required by TX1 before the original job can be resumed after a power loss event. The
steps/screenshots below assume the original drives are connected and available to the
system after power was restored.
Copyright © 2022 Open Text. All rights reserved. Trademarks owned by Open Text.