EasyManua.ls Logo

Pentair FLECK 5800 SXT - Operation; Display During Operation; During Regeneration; Recommendations

Pentair FLECK 5800 SXT
92 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installer Manual Fleck 5800 - SXT - Operation
Ref. MKT-IM-004 / A - 18.04.2017 67 / 92
8. Operation
8.1. Display during operation
Examples:
Note
In delayed volumetric mode, the icon flashes as soon as the reserve begins to be used.
8.1.1. During regeneration
During a regeneration the display shows the current cycle step and the time remaining for that cycle.
The countdown for the time remaining starts only when the valve is in the cycle displayed.
Examples
8.2. Recommendations
Use only regeneration salts designed for water softening upon regulation EN973.
For optimal system operation, the use of clean salt and impurities free is recommended (for
example salt pellets).
The sanitizing process (both with liquid and electrochlorination) may introduce chlorine
compounds which may reduce the lifetime of the ion exchange resins. Refer to the technical
guides for resins in common use, providing necessary checks on the system.
Valve in service with day time:
Valve in service with volume remaining before regeneration:
Remaining days before next regeneration:
In volumetric regeneration mode, reserve 1223 litres remaining:
In volumetric regeneration mode, exhausted reserve, immediate
or delayed start in regeneration depending on the adjustment:
Refill cycle, 12 min 38 sec. left:
Rapid rinse cycle, 2 min 17 sec. left:

Table of Contents

Other manuals for Pentair FLECK 5800 SXT

Related product manuals