A12 Striking
Panels
Always begin in the corner where both
infills meet.
Dismantle Panel SDP in one bay after
the other – begin with the middle pan-
el.
Lift panel and push approx. 10 cm in
the direction of the compensation
area. Pivot downwards and store in
pallets.
(Fig. A12.03)
Main beams
Pivot Main Beam SLT slowly down-
wards, remove and store in pallets.
(Fig. A12.04)
Only drophead props (1) with Cover
Strips SAL (4) remain standing.
(Fig. A12.05)
Remaining areas
Remove props on walls and store in
pallets.
Remove filler areas around columns.
After reaching the required concrete
strength
lower drophead props, remove props
and store in pallets.
remove Cover Strips SAL (4).
With larger spans, begin in the middle
with lowering and removal of the props.
Cleaning
Clean SKYDECK components before
the next use and spray once again, e.g.
with PERI Bio Clean.
See introduction “Cleaning and mainte-
nance”.
Fig. A12.03
Fig. A12.04
Fig. A12.05
SKYDECK Panel Slab Formwork
Instructions for Assembly and Use – Standard Configuration
SKYDEKC AuV_ex_791458.indb 63 13.12.16 16:58

Table of Contents

Related product manuals