Presents the main components of the CB 160 climbing formwork system.
Details various variants for anchoring the formwork to the building structure.
Outlines the sequential steps for the standard workflow of formwork operation.
Explains the standard configuration and operational principles of the CB 160 system.
Defines the specific applications and user requirements for the CB 160 system.
Provides critical safety guidelines for handling and operating the CB 160 formwork.
Guidelines for safe storage and transportation of system components.
Specific safety and operational considerations for the CB 160 system.
Details the load models and classes applicable to the formwork platforms.
Lists necessary equipment, tools, and materials for assembly.
Step-by-step guide for assembling the console bracket component.
Instructions for the assembly and integration of girders into the system.
Procedure for assembling the adjustable unit of the CB 160 system.
Steps for installing guardrail posts for platform safety.
Instructions for installing the platform decking.
Guide for attaching guardrails to ensure platform safety.
Specific instructions for assembling end guardrail posts.
Procedure for installing hinged hatch covers.
Steps for assembling the finishing platform.
Final tasks and checks after assembly.
Detailed procedures for anchoring the system to the structure.
Instructions for mounting the platform onto the initial wall section.
Guide for installing the finishing platform.
Steps for installing wind bracing for stability.
Procedure for removing climbing cones.
Instructions for disassembling the system.
Guide for assembling access ladders.
Assembly instructions for the VARIO GT 24 formwork element.
Assembly instructions for the TRIO formwork element.
How to use the adjusting unit for formwork alignment.
Procedures for aligning the formwork accurately.
How to move VARIO elements horizontally using waler fixation.
Preparatory steps before moving climbing units.
Step-by-step guide for moving the climbing units.
Procedures for securing the unit after moving.
Analysis of static systems and load combinations for planning.
Guidelines for dimensioning platforms based on load and span.
Verification steps for structural anchoring and load transfer.
Requirements and layout for platform decking installation.
Guidelines for installing handrails and guardrails for safety.
Procedures for connecting VARIO GT 24 formwork.
Procedures for connecting TRIO formwork.
Planning considerations for moving units.
Planning and parts list for ladder access systems.
Requirements for assembly and arrangement drawings.
Specific planning for circular structures.
Planning and erection of corner platforms.
Guidelines for using the system as a working or safety scaffold.
Safety requirements for protective access scaffolds.