26 Instructions for Assembly and Use – Standard Configuration
CB 160 Climbing Formwork
B1 Work on the construction site
Mounting the climbing
platform CB 160
to the first wall section
Use 4-sling lifting gear with suffi-
ciently long chains and securing
devices!
Crane sling angle max. 30°!
Observe permissible load capacity!
Assembly
1. Bolt two platform connections (1.4) to
each CB 160 bracket.
2. Attach lifting gear hook to the bails of
the platform connections.
(Fig. B1.19)
3. Remove safety bolts (1.5).
(Fig. B1.20)
Before moving
Is the locking device on the lifting
hook closed?
Is the lifting angle correct?
Have loose parts been removed?
Have the safety pins (1.5) been com-
pletely removed? (Fig. B1.21)
The platform is now ready to be moved.
Fig. B1.20
Fig. B1.19
1.5
1.4