49Instructions for Assembly and Use – Standard Configuration
CB 160 Climbing Formwork
B4 Moving the units
Securing the unit
If the securing bolts cannot be
inserted, repeat the procedure!
1. Enter platform.
2. Insert safety pins (1.5) under the
Scaffold Mounting Ring (5.6).
(Fig. B4.03 + B4.03a)
Use cut-out in the planking.
3. Remove crane hook.
4. Close decking (10.3) on concreting
platform.
Fig. B4.03
Fig. B4.03a
10.3
1.5
1.5
5.6