62
A12 Striking
Setting times: see Tables!
Keep access ways free!
Dismantling takes place from a safe and
secure position, e.g. with PERI Stripping
Cart ASW 465.
Lowering
Lower dropheads over large area. Re-
lease wedges with hammer. Pay at-
tention to direction of wedge!
Between the panel and slab
underside there is a clearance of
approx. 6 cm. (Fig. A12.01)
Edge infills
Striking takes place firstly on the trans-
verse infills and then the longitudinal
infills.
Remove props and store in pallets.
Dismantle system supplements such
as filler timbers, edge beams, end
supports and combiheads, and store
in pallets. (Fig. A12.02)
Remove filler plates.
Striking is carried out by means of a
safe mobile scaffold!
Fig. A12.01
Fig. A12.02
SKYDECK Panel Slab Formwork
Instructions for Assembly and Use – Standard Configuration