7
9929422 R02 - 2017-2019 ACE 900 Service Manual
© Copyright Polaris Industries Inc.
7.39
19.Torque the tie rod end fastener
u
to specification and
install a new cotter pin
i
.
TORQUE
Tie Rod End Fastener:
42 ft-lbs (57 Nm)
20.Torque wheel hub nut
o
to specification and install a
new cotter pin
a
. Tighten nut slightly if necessary to
align cotter pin holes. Bend both ends of cotter pin
around end of spindle in different directions.
TORQUE
Wheel Hub Castle Nut:
110 ft-lbs (149Nm)
21.Install wheel and four wheel nuts. Torque wheel nuts
to specification.
TORQUE
Aluminum Wheels:
30 ft-lbs + 90° (41 Nm)
FINAL DRIVE