www.poolpak.com | 800-959-772542 | MPK Series - Installation, Operation and Maintenance
Condensate Drains
Condensate Drainage System Features
The diamond plate floor is sloped towards a center drainage channel for each compartment.
Each compartment has its own drain piping to either side of the unit
For units selected with a curb, the unit can be ordered with through the curb/bottom condensate drainage. Each
compartment will still require field installation of a drain trap and condensate piping.
For units without a curb and/or without bottom condensate drainage, field installation of positive and negative
pressure condensate drain traps is required.
For outdoor units, these traps must also be heat-taped and insulated to protect against freezing.
Exceptions
With an integral air-cooled condenser, the compressor module section does not have the center drain or
condensate drain piping.
The integral air-cooled condenser section (located above the compressor module section if selected) does not
require condensate drain piping.
Drain Trap Field Installation Instructions
A drain trap is required on one side of each compartment. The other side should be plugged.
Depending on the selection of the unit, a variable number of drain traps are required.
Drain traps located upstream of the supply fans require negative pressure condensate drain traps. See Figure 4-6
Drain traps located downstream of the supply fans (supply fan compartment, electric heat module, and gas
funace compartment) require positive pressure condensate drain traps. See Figure 4-7.
See below illustrations for more detail on the sizing of the negative and positive pressure condensate drain traps.
Since the drain traps are vented to ambient pressure, they can be tied together and directed towards the nearest
roof or floor drain.
Required Materials
Schedule 40 (minimum) PVC plastic pipe, elbows, tees, and a removable cap for a cleanout.
For outdoor units, wrap drain lines and trap with electric heat tape (follow manufacturer’s instructions) controlled
by an automatic thermostat set at a minimum of 35°F to protect against freezing.
For outdoor units, insulate all external condensate piping. Insulation must be sealed at all seams.
For additional questions or concerns regarding installation of condensate drains, please contact PoolPak Service.
Power for the field-installed heat tape must be supplied external to the PoolPak unit.