EasyManua.ls Logo

Quantum Systems VECTOR - Battery Setup

Quantum Systems VECTOR
126 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
27
Assembly, Disassembly & Charging
6
The QS Smart Battery Pack (SBP) is a Vector/Scorpion custom designed Li-Ion power source. It will enable you to maximize the
performance and safety of your Vector/Scorpion missions.
Transport conguration and operational mode
You will receive your SBP in transport conguration. This ensures the battery can travel safely and follow transport regulations by
physically splitting it into modules of less than 100 Wh.
To be able to use the SBP it must be set to operational mode:
1. Unscrew the 2 nuts and remove the red Transportation Lid .
The self-locking nuts may not be used twice!
2.
Use the contact cleaning pen to clean the contacts of the six bridges and the contacts of the battery .
3. Insert the 6 SBP bridges into the slots. Use new nuts to screw the bridges back on (use the included 0.9 Nm torque
wrench).
4. When assembling the bridges, follow the order on m.
5. Press the reset button and the program button on the bottom of the battery with the reset pin.
6. The Status LED will start ashing for 60 seconds.
7. Press the Start-Button before inserting the battery into the aircraft. The battery will turn off after 60 seconds if not installed.
Note: If you are planning to send a SBP simply remove the bridges, re-install the red Transportation Lid and do not forget to
send the bridges in the package.
The Vector package includes 600 self-locking nuts to ensure 100 SBP bridge assembly/disassembly cycles.
The self-locking nuts may not be used twice!
The cleaning process is always necessary after removing the red Transportation Lid and before assembling the
bridges.
6.2 Battery setup

Table of Contents