Current Section: Setup 31
Navigation:
1 Station Number (1-48) LXME2 has a capacity of 48 programs
2 Program Assignment (1-40) LXME2 has a 40 independent Programs available.
•
Non-irrigation priority stations will always be selected to operate rst
Station Sequencing by Station Priorities
This option is required when using Flo-Manager®. This option decreases the overall time required to
complete watering when operating multiple stations simultaneously.
Stations will operate in the following order:
1 Station priority Non-Irrigation > High > Medium > Low
2 Station Run Time Longest run time > shortest run time
3 Station number LXME2 has a capacity of 48 programs
4 Program assignment LXME2 has a 40 independent Programs available.
Next
Advanced Station Settings
Cycle & Soak
Inter-Station Delay
SimulStations
Station Sequencing
Module/Station Numbering
Done
Sequence by:
Station Numbers
1 Turn the controller dial to Setup
2 At the Advanced Station Settings screen, press the button to navigate to “Station
Sequencing”, then press Next .
3 At the Station Sequencing screen, press the and keys to set Station Sequencing by
either Station Numbers or Station Priorities, as desired.
•
If Flo-Manager® is turned ON, then the default Station Sequencing setting is Sequence by Station Priorities.
To select Station Sequencing by Station Number, Flo-Manager® must rst be turned OFF. See “Set Flo-
Manager®” or more details.
•
When Station Sequencing is set to Sequence by Station Priorities, you can still manually operate stations
in station number sequence using the Test All Stations option from the Manual Watering dial position. See
“Test All Stations” for more details.