EasyManuals Logo

Rain Bird LXME2 User Manual

Rain Bird LXME2
91 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #36 background imageLoading...
Page #36 background image
Current Section: Water Days 36
Navigation:
7. WATER DAYS
Watering Days are the specic days of the week on which irrigation is allowed to occur.
The LXME2 controller supports a variety of exible watering day cycle options.
By Day of Week: irrigation starts at chosen individual days in the week where program starts are
allowed.
Cyclic days: irrigation starts at regular chosen intervals such as every 3rd or 5th day, regardless of
the calendar date.
Even Dates: irrigation starts on all even numbered calendar days, such as the 2nd, 4th, 6th, etc.
Odd Dates: irrigation starts on all odd numbered calendar days, such as the 1st, 3rd, 5th, etc.
Odd Dates no 31st: irrigation starts on all odd numbered calendar days, such as the 1st, 3rd, 5th,
etc., but not on the 31st.
Regardless of the Watering Cycle, irrigation will start only on days of the week where program starts are
allowed.
7.4.1 Custom, By Day of Week
Mode
Off On
Mon
Tue
Wed
Thu
Fri
Sat
Sun
On
On
Off
Off
Off
On
On
PGM01
By Day of Week
1 Turn the controller dial to Water Days
2 The Custom, By Day of Week screen appears.
3 Press the On key to allow irrigation on a given day of the week or else press Off to prevent
from starting on that day.
4 Press the
and keys to navigate through the days of the week.

Table of Contents

Other manuals for Rain Bird LXME2

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Rain Bird LXME2 and is the answer not in the manual?

Rain Bird LXME2 Specifications

General IconGeneral
BrandRain Bird
ModelLXME2
CategoryController
LanguageEnglish

Related product manuals