EasyManua.ls Logo

Rauch quantron e - Installation Order and Steps

Rauch quantron e
85 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Attachment and installation
15
3
Carry out the installation in the following order.
Select a suitable position in the tractor cabin (in the driver's field of view) to
attach the control unit.
Install the control unit with the bracket in the tractor cabin.
Connect the control unit to the 7-pin socket or to the ground speed sensor (de-
pending on the equipment package, see Figure 3.3
to Figure 3.5).
Connect the control unit to the actuating cylinders of the fertiliser spreader us-
ing the 39-pin machine cable.
Connect the control unit to the tractor power supply using the 3-pin plug con-
nector.