EasyManuals Logo

Rauch quantron e User Manual

Rauch quantron e
85 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #23 background imageLoading...
Page #23 background image
Operation Quantron E
21
4
4 Operation Quantron E
4.1 Switching on the control unit
Requirements:
The control unit is correctly connected to the fertiliser spreader and the tractor
(3.3:
Connecting the control unit, page 14).
The voltage is at least 11 V.
NOTICE
The operator manual describes the functions of the control unit Quantron E as
of software version 3.30.00.
n CAUTION
Risk of injury from discharged fertiliser
Only for mineral fertiliser broadcasters equipped with electronic
control units
In the event of faults, the metering slide could open unexpectedly
en route to the spreading location. There is a danger of people
slipping on the discharged fertiliser and injuring themselves.
Before setting off to the spreading location you must
switch off the Quantron E electronic control unit.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Rauch quantron e and is the answer not in the manual?

Rauch quantron e Specifications

General IconGeneral
BrandRauch
Modelquantron e
CategoryController
LanguageEnglish