EasyManua.ls Logo

Raven Sidekick Pro - Verifying Installation of the Sidekick Pro

Raven Sidekick Pro
86 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3
Manual No. 016-0171-391 23
Installation
Verifying Installation of the Sidekick Pro
Note: Before filling the tank with chemical for the first time, thoroughly vacuum the chemical supply tank
and clean any plastic or metal particles that may be left from the manufacturing or installation
process. If these particles get stuck within the injection pump, they may cause a significant
reduction in pump accuracy. Turn the hand valve(s) to allow the tank to drain without running
through the pump or injection plumbing and thoroughly rinse tank prior to testing or running the
injection system for the first time.
Perform the procedures outlined in the Normal Application Mode section on page 29 to verify that the system is
installed properly.
Fill the chemical supply tank with clean water when checking the installation. Check for any leaks on all
plumbing connections before applying chemicals with the injection system. It is recommended to check the
system periodically and replace worn or damaged connections, valves, or hoses.

Table of Contents

Other manuals for Raven Sidekick Pro

Related product manuals