EasyManua.ls Logo

Raven Sidekick Pro - Calibration and Operation; Control Console Calibration

Raven Sidekick Pro
86 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CHAPTER
4
Manual No. 016-0171-391 25
C hapter 4
Calibration and
Operation
Control Console Calibration
Once installation of the injection system has been verified, and the motor control node is recognized by the
CAN control console, the Sidekick Pro and console must be calibrated to provide accurate control of the
injected product.
Note: The Sidekick Pro motor control node is only capable of operating in a liquid chemical application
mode.
Regardless of which control console is used to control the Sidekick Pro, the following settings must be
calibrated or programmed to ensure proper control and operation of the pump:
Meter Cal
Valve Type and Valve Cal
Rate Cal
PVD or FER Error Cal
Pressure Transducer Cal
Note: These settings must be programmed for each injection product or pump which will be used to
control product during an application. Refer to the specific control console manual for instructions
on programming these settings or other calibration information on the console.

Table of Contents

Other manuals for Raven Sidekick Pro

Related product manuals