EasyManua.ls Logo

Robinson R66 - Page 488

Robinson R66
950 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
62-22 Inspection and Repair (continued)
4. Fluorescent penetrant inspect hub per § 20-42.
5. Prime hub per § 20-60.
6. Install bearings per § 62-21 steps 6 thru 8.
7. Mask bearings and topcoat hub assembly per § 20-60.
8. When top coat has sufficiently cured, remove masking.
Page 62.10B Chapter 62 Main Rotor JUL 2020

Table of Contents