Rockwell Automation Publication ICSTT-RM447M-EN-P - July 2019 145
System Build Chapter 9
Adding Field Cable
Management
The field, power and other system wiring will be connected to terminals along
the top of the base units. It is recommended a length of cable trunking or the
equivalent be put above each set of base units, for cable management.
Figure 37 - Field Wiring Connections