Specifying a New Controller
This chapter goes through a list of key information needed to specify a new
AADvance controller. The flowcharts and tables that follow will guide you
through the process of defining a system for your business application and
system requirements.
Information to Specify a New
Controller
The following sets of information are needed to specify a new controller:
The intended safety integrity level (SIL 2 or SIL 3) for your application
The desirable degree of fault tolerance
Whether any final elements are energize to action (affects output
module arrangements for SIL 3 requirements)
The type and quantity of inputs and outputs
The process safety time for each safety function
Do you need a "hot swap" feature for any channels
All of these items must be assessed and known for the specified plant and the
intended application.
Define a New System
The charts use minimal designs to illustrate solutions.

Table of Contents

Other manuals for Rockwell Automation Allen-Bradley AADvance T9110

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Rockwell Automation Allen-Bradley AADvance T9110 and is the answer not in the manual?

Rockwell Automation Allen-Bradley AADvance T9110 Specifications

General IconGeneral
BrandRockwell Automation
ModelAllen-Bradley AADvance T9110
CategoryController
LanguageEnglish

Related product manuals