EasyManua.ls Logo

Rohde & Schwarz NRP2 - 1 Putting into Operation; 1.1 Notes on putting into operation

Rohde & Schwarz NRP2
419 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Putting into Operation
NRP2
7User Manual 1173.9140.02 ─ 07
1 Putting into Operation
This section describes the basic steps to be taken when setting up the R&S NRP2 for
the first time.
It contains the following topics:
unpacking
AC supply connection
switching the meter on and off
function testing and installing the meter
preset or default settings
front and rear views
1.1 Notes on putting into operation
Risk of instrument damage
Note that the general safety instructions also contain information on operating condi-
tions that will prevent damage to the instrument. The instrument's data sheet may con-
tain additional operating conditions.
Risk of instrument damage
Before putting the R&S NRP2 into operation, make sure that:
the sensor inputs are not overloaded
the meter’s outputs are not overloaded or wrongly connected
the ventilation holes are not obstructed
The meter may be damaged if these precautions are not observed.
Notes on putting into operation
北京海洋兴业科技股份有限公司(证券代码:839145)
电话:010-62176775
网址:www.hyxyyq.com

Table of Contents

Related product manuals