EasyManua.ls Logo

Rohde & Schwarz NRP2 - 1.8 Starting the R&S NRP2

Rohde & Schwarz NRP2
419 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Putting into Operation
NRP2
18User Manual 1173.9140.02 ─ 07
1.8 Starting the R&S NRP2
1.8.1 Switching on
1. To turn the power on, press the main power switch at the rear to position I (On).
Fig. 1-6: Power switch
After power-up, the instrument is in standby or ready state, depending on the state
of the ON/STANDBY key at the front panel of the instrument when the instrument
was switched off for the last time.
2.
Press the ON/STANDBY key to switch the instrument from the standby to ready
state.
Fig. 1-7: ON / Standby key
green and yellow = ready for operation
yellow = standby, AC supply is connected and power supply is operating correctly
off = off and disconnected from the AC supply
1.8.2 Startup
Press the ON/STANDBY key to switch to ready state.
The R&S NRP2 initiates its startup procedure, i.e. it boots the operating system,
automatically performs a selftest and starts the instrument firmware. If the previous
session was terminated regularly, the instrument uses the last setup with the rele-
vant instrument settings.
Use the (PRE)SET key to return the instrument to its definite reset/preset state, if the
current setup is no longer relevant.
To customize the start settings use the "File" dialog box, see chapter 4.6, "Manage-
ment of settings", on page 141.
Starting the R&S NRP2
北京海洋兴业科技股份有限公司(证券代码:839145)
电话:010-62176775
网址:www.hyxyyq.com

Table of Contents

Related product manuals