Putting into Operation
NRP2
18User Manual 1173.9140.02 ─ 07
1.8 Starting the R&S NRP2
1.8.1 Switching on
1. To turn the power on, press the main power switch at the rear to position I (On).
Fig. 1-6: Power switch
After power-up, the instrument is in standby or ready state, depending on the state
of the ON/STANDBY key at the front panel of the instrument when the instrument
was switched off for the last time.
2.
Press the ON/STANDBY key to switch the instrument from the standby to ready
state.
Fig. 1-7: ON / Standby key
green and yellow = ready for operation
yellow = standby, AC supply is connected and power supply is operating correctly
off = off and disconnected from the AC supply
1.8.2 Startup
► Press the ON/STANDBY key to switch to ready state.
The R&S NRP2 initiates its startup procedure, i.e. it boots the operating system,
automatically performs a selftest and starts the instrument firmware. If the previous
session was terminated regularly, the instrument uses the last setup with the rele-
vant instrument settings.
Use the (PRE)SET key to return the instrument to its definite reset/preset state, if the
current setup is no longer relevant.
To customize the start settings use the "File" dialog box, see chapter 4.6, "Manage-
ment of settings", on page 141.
Starting the R&S NRP2
北京海洋兴业科技股份有限公司(证券代码:839145)