EasyManuals Logo

Shimadzu GCMS-QP2010 User Manual

Shimadzu GCMS-QP2010
168 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #113 background imageLoading...
Page #113 background image
113
1. Precautions during maintenance work
Replacing CPU-A
Restore the backed up E2PROM contents.
Upgrade the Flash ROM, if required.
Replacing RF PS Assy
Sensitive to static electricity. Take care.
Conduct tuning.
Adjust according to the RF power supply adjustment.
Replacing a turbo molecular pump (TMP)
Reset the TMP operating time.
Replacing a rotary pump (RP)
Reset the RP operating time.
Reference
Approximate Maintenance Plan (Units: months)
Item 3 6 9 12 15 18 21 24 27 30 33 36
RP oil * * * * * * * * * * * *
Clean ion-source * * * * * *
GC trap * * * * * *
GC molecular
sieve filter
* * *
RP overhaul * *
Clean lenses * *
Clean pre-rod * *
Detector *
IG *
PG *
TMP overhaul *

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Shimadzu GCMS-QP2010 and is the answer not in the manual?

Shimadzu GCMS-QP2010 Specifications

General IconGeneral
BrandShimadzu
ModelGCMS-QP2010
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals