Check if the feed box, screen bracket and storge box are locked tight.
Check the clearance between fixed blade and rotary blade (0.2~0.3mm).
Check the dynamic balance of belt pulley.
Electrical Installation
Voltage: V Hz
Specs of the fuse: 1 Phase A 3 Phase A
Check phase sequence of the power supply.
Check the turning direction of the conveying blower.
6.6.3 Daily Check
Check main power switch.
Check emergency stop button.
Check start / stop button.
Check if the material fender (strip) is in good condition.
Check whether emergency stop and safety switch works normally.
Clean screen and feed box.
Check whether start, stop and power switches works normally.
6.6.4 Weekly Check
Check all the electrical cables.
Check if there are loose connections of electrical components.
Check blade condition.
Check whether the screws for fixing the fixed and rotary blades are loose.
Check if there is abnormal noise, vibration and heat in reduction gear.
Check the cracking condition of the window.
6.6.5 Monthly Check
Check the pneumatic bracket.
Check the delay function of feeding motor.
Check the overload protection function of the motor.
Check the tightness of the blades.
Check whether the belt pulley clamp is tight.
Check belt tension.
6.6.6 Check Half-yearly or Every 1000 Running Hours
Check the lubrication of bearing, motor and hopper shaft.
Check the belt pulley.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Shini SG-23 Series and is the answer not in the manual?

Shini SG-23 Series Specifications

General IconGeneral
BrandShini
ModelSG-23 Series
CategoryIndustrial Equipment
LanguageEnglish

Related product manuals