35
8011952/YWL2/3-0/2016-08| SICK OPERATING INSTRUCTIONS | DUSTHUNTER C200
Subject to change without notice
ASSEMBLY AND INSTALLATION 3
3.2 Assembly
Carry out all assembly work onsite. This includes:
▸ Fitting the flange with tube
▸ Fitting the MCU control unit,
▸ Fitting the optional external purge air unit.
3.2.1 Fitting the flange with tube
Fig. 17: Fitting the flanges with tube
Dimension a must be large enough so that a weatherproof cover can be fitted easily when
necessary (approx. 40 mm).
Work to be performed
▸ Measure the fitting location and mark the assembly location.
Leave enough clearance around the flange with tube to fit the sender/receiver unit and
reflector.
WARNING:
▸ Observe the relevant safety regulations as well as the safety notices during
all work: see “Important Information”, page 7
▸ Consider the equipment weight specifications when planning the mounting
brackets.
▸ Only carry out assembly work on equipment with hazard potential (hot or
aggressive gases, higher internal duct pressure) when the equipment is at a
standstill.
▸ Take suitable protection measures against possible local hazards or hazards
arising from the equipment.
All dimensions specified in this Section are shown in mm.
Component D
Sender/receiver unit DHC-T
Ø 76
Reflector/scattered light receiver DHC-R0
Scattered light receiver DHC-R1 Ø 159
TOP
Assembly on steel duct
A
A
A
A
Marking for assembly position
> 30
a
Ap-
prox
. 1°
Ø 76
Assembly on brick stack Assembly on thin-walled duct
Junction plate
Anchor plate
Duct wall
Fixing bolt for weatherproof cover
Flange with tube