MAINTENANCE AND REPAIR 7
8022965-17I6/2020-03-19|SICK
Subject to change without notice
ORIGINAL OPERATING INSTRUCTIONS| VMS4200/5200 (Multicontroller)
Fig. 82: Dowel pins and locating holes
▸
Press the device into place with one hand and screw the device to the mounting plate.
▸
Make sure that the device is securely screwed on.
▸
Screw the connecting cables back on.
▸
Switch the voltage supply back on.
▸
Check that the status LED lights up green after approximately 40 seconds.
▸
Conduct a test run and check whether the multi-dimensional measurement system
is providing plausible measurement results.
NOTE! It may be necessary to recalibrate the exchanged 2D LiDAR sensor using SOPAS.
▸
After replacing a component, contact the manufacturer.
▸
The manufacturer will arrange for the system to be reverified after the replacement of
a component.
Mounting the
replacement device
Test run
Restoring
MID conformity