EasyManua.ls Logo

Siemens ADVIA 2400 - Times Required to Perform Prime, Washes, and Cell Blank

Siemens ADVIA 2400
200 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operating the System 71
(1) At the Menu Panel, select Reagent, then select Reagent Inventory.
(2) Execute a Barcode Scan at the Reagent Inventory window.
(3) Evaluate calibration status.
4. Perform a start-up wash.
WASH 3 or Startup wash, 26 minutes
CTT position 51 DI water (tube)
RTT1 position 50 DI water (70-mL container)
RTT2 position 50 DI water (70-mL container)
WASH 2 or Shutdown wash, 38 minutes
CTT position 15 ISE detergent (cup)
CTT position 16 DI water (tube)
CTT position 49 10% cuvette wash (tube)
CTT position 50 DI water (tube)
RTT1 position 49 10% cuvette wash (70-mL
container)
RTT1 position 50 DI water (70-mL container)
RTT2 position 49 10% cuvette wash (70-mL
container)
RTT2 position 50 DI water (70-mL container)
Weekly wash set up
Same as WASH 2, except replace the 10% cuvette wash with 5%
reagent probe wash in both the CTT and RTT positions.
Times required to perform prime, washes, and cell blank
Typical times
Operation Cycles Time (minutes)
PRIME1 5 1:40
WASH1 1 9:10
WASH2 2 38
WASH3 1 26
Cell blank NA 14
Times for combined operations during startup and shutdown
Startup
PRIME1 + WASH3 = 28 minutes
PRIME1 + WASH3 + Cell blank = 42 minutes

Table of Contents

Other manuals for Siemens ADVIA 2400

Related product manuals