32.3 Operation with power supply from control unit
from CC11 operating unit is connected to E3X10.
from CI11 operating unit is connected to AlgoPilot B3Q...
Note: A 2nd supply output is only necessary for operating units which must comply with EN54 (at least 1 operating unit per system)
E3X10.
Output 1
+ / – / Earth
Output 2
I-Bus
AlgoPilot B3Q...
Output 1
+ / – /Earth
Output 2
I-Bus
24V / 2A 24V / 2A
CC11
CT11 CT11
CI11
32.4 Operating unit with autonomous power supply
for AlogPilot B3Q... control terminals installed at a considerable distance
operating unit and power supply can be installed in H38 cabinets see page 47
* TF = Temperature sensor for battery temperature monitoring
Mains
29,6V
Batteries
AX12..
E3C011
I-Bus
C-Bus
TF*
B2F020
CT11
AlgoPilot B3Q...