Appendix
A.7 Acceptance tests for the safety functions
Acceptance test reports … … … …
Countersignatures
Commissioning engineer
This confirms that the tests and checks have been carried out properly.
This confirms that the settings recorded above are correct.
… … … …
Converter with control units CU240D-2
314 Operating Instructions, 04/2015, FW V4.7.3, A5E34262100B AB