Commissioning guidelines
Overview
Define the requirements of your
application placed on the drive.
→ (Page 66) .
Reset the inverter when
required to the factory setting.
→ (Page 85) .
Check whether the factory
setting of the inverter is already
sufficient for your application.
When commissioning the drive,
set the following:
– The closed-loop motor
control
– The inputs and outputs
– The fieldbus interface
When required, adapt the drive
→ (Page 115).
Back up your settings
→ (Page 219).
Converter with control units CU240D-2
Operating Instructions, 04/2015, FW V4.7.3, A5E34262100B AB
65