Installation
4.2 Electrical Installation
Connect the PE terminal on the left-hand
side of the converter to the metal frame it
is mounted on.
Recommended cable cross section:
10 mm²
Use a short wire connection preferably.
Clean the connection to the steel
construction from paint or dirt.
Use a ring clamp to ensure a good
physical connection which is resistant to
accidental disconnection.
● Ground the motor via the PE connection in the motor connector.
● Ground the connector as shown in the diagram above (grounding the converter).
Although the line and motor connectors are of a different type, the principle of grounding
them is the same.
● If possible, ground the motor housing.
Where cable glands are used within the installation of the system, it is recommended that
EMC glands are used.
The cable gland provides protection to the IP68 standard when fitted correctly.
Figure 4-17 Example of a Blueglobe EMC cable gland
Table 4- 16 Brass-nickel plated EMC cable gland with metric thread as per EN50262.
Clamping range
without inlet
max/min [mm]
Clamping
range max/min
[mm]
Converter with control units CU240D-2
Operating Instructions, 04/2015, FW V4.7.3, A5E34262100B AB
61