EasyManua.ls Logo

Siemens SINAMICS G120D Series - Page 67

Siemens SINAMICS G120D Series
326 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Commissioning
5.2 Preparing for commissioning
Switching the motor on and off
The inverters are set in the factory in such a way that, after switching on, the motor will
accelerate up to its speed setpoint in 10 seconds (referred to 1500 rpm). After it has been
switched off, the motor also brakes with a ramp-down time of 10 seconds.
Figure 5-1 Switching on and switching off the motor and reversing in the factory setting
Switching the motor on and off in the jog mode
In the case of inverters with a PROFIBUS or PROFINET interface, operation can be
switched via digital input DI 3. The motor is either switched on and off via PROFIBUS or
operated in jog mode via its digital inputs.
When a control command is received at the respective digital input, the motor rotates at
±150 rpm. The ramp-up and ramp-down times are also 10 seconds, referred to 1500 rpm.
Figure 5-2 Jogging the motor with the factory settings
Operating the motor with the factory settings
In simple applications, you can attempt to operate the drive with a power rating < 18.5 kW
without having commissioned it. Check that the control quality of the drive is good enough for
the requirements of the application without commissioning.
We recommend configuring the drive with the precise motor data.
Converter with control units CU240D-2
Operating Instructions, 04/2015, FW V4.7.3, A5E34262100B AB
67

Table of Contents

Related product manuals