Performing installation
$
$
"Options" terminal block Connecting cable terminal blocks
"Standard" terminal block
Figure7-16 Inserting and connecting terminal blocks
1. Inserting the terminal block:
Insert the "Options" terminal block above the factory-installed "Standard" terminal
block .
Tighten the 4 screws with a torque of 2.0Nm.
2. Connect both terminal blocks with the existing connecting cable .
3. Install the cable gland plate including both terminal blocks and with eleven hex nuts
with a torque of 0.8Nm.
4. Tighten the screw for the cable gland plate again with a torque of 2.0Nm.
Note
You use the same procedure for the conduit connections as for the cable gland plate.
Installing / removing and connecting analyzer and option modules
7.11Installing option modules
Wall-mounted device
Operating Instructions, 07/2023, A5E31930403-AB 87

Table of Contents

Other manuals for Siemens SIPROCESS GA700

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Siemens SIPROCESS GA700 and is the answer not in the manual?

Siemens SIPROCESS GA700 Specifications

General IconGeneral
BrandSiemens
ModelSIPROCESS GA700
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals