Commissioning
SIRIUS 3RW44 System Manual
5-4 GWA 4NEB 535 2195-02 DS 04
5.2 Switching on for the First Time
Warning
Before switching the device on for the first time, verify that the main/control
side is wired properly. Make sure that the supply and control voltage comply
with the device-specific requirements (Chapter 10.3 "Technical Data").
5.2.1 Recommendation on Procedure for 3RW44 Commissioning
Notice
This table provides example set values. They serve as reference for informational
purposes only and are non-binding. The set values depend on the particular application
and must be optimized during commissioning.
Suggested setting
Starting parameters Stopping parameters
Starting mode: Voltage ramp and current limiting
(U+current limiting)
Stopping mode Parameter
Start
voltage %
Starting
time s
Current
limit value
Breakaway pulse
Stopping
time s
Stopping
torque %
Application
Conveyor belts 70 10
Deacti-
vated
Deactivated (0 ms) Torque control 10 10
Powered roller
conveyors
60 10
Deacti-
vated
Deactivated (0 ms) Torque control 10 10
Compressors 50 10
4xI
e
Deactivated (0 ms) Coasting down X X
Small ventilators 30 10
4xI
e
Deactivated (0 ms) Coasting down X X
Pumps 30 10
4xI
e
Deactivated (0 ms) Pump stop 10 10
Hydraulic pumps 30 10
4xI
e
Deactivated (0 ms) Coasting down X X
Stirrers 30 30
4xI
e
Deactivated (0 ms) Coasting down X X
Centrifugal machines 30 30
4xI
e
Deactivated (0 ms) Coasting down X X
Milling machines 30 30
4xI
e
Deactivated (0 ms) Coasting down X X
Large fans 30 60
4xI
e
Deactivated (0 ms) Coasting down X X
Mills 50 60
4xI
e
80 % / 300 ms Coasting down X X
Crushers 50 60
4xI
e
80 % / 300 ms Coasting down X X
Disk saws/ribbon
saws
30 60
4xI
e
Deactivated (0 ms) Coasting down X X